Name of Project & Capacity (CKm/MVA) | Physical Progress (%) |
---|---|
Substations Lines |
|
Construction of 220/33 kV (2x 50 MVA) GIS S/s, Selaqui, Dehradun | 62 |
132/33 (2x40 MVA) GIS S/s Khatima. | 50 |
132/33 (2x40 MVA) GIS S/s Dhaulakhera. | 46 |
132/33KV (2x20 MVA) GIS S/s Lohaghat. | 46 |
132/33 kV (2x40 MVA) GIS S/s, Araghar, Dehradun. | 45 |
220/132/33 KV (2x160 MVA + 2x40 MVA) AIS S/s, Manglore, Haridwar. | 24 |
400 kV GIS Switching S/s Pipalkoti. | 20 |
220/33 KV GIS S/s Banbasa. (2X50 MVA) | 10 |
220/33 kV GIS S/s Ghansali. (6X10 MVA) | 5 |
Transmission Lines |
|
220 KV D/C Interconnection point of Singoli HEP-220 kV Barhamwari S/s (Proposed) T/L (31 Ckm) | 95 |
400 kV DC Pipalkoti -Srinagar T/L (Package-1,2,3) (173 Ckm) | 88 |
400 kV DC Tapovan (Vishnugad) - Pipalkoti T/L (36 Ckm) | 60 |
Stringing of IInd circuit of 132 kV D/C T/L on Panther conductor from Pithoragarh (PGCIL)-Champawat (Lohaghat) (39.33 Ckm) | 48 |
LILO of 220 kV Khodri-Jhajra T/L at 220 kV S/s Selaqui Dehradun with Underground Cable, (0.7 Ckm ). | 47 |
LILO of 132 kV Majra-Laltappar T/L at 132 kV S/s Araghar Dehradun through 132 kV Underground Cable, (3.6 Ckm). | 28 |
LILO of 132 kV Manglore- Asahi line & Manglore-Air-Liquid T/L at 220 kV S/s Manglore (2 Ckm) | 25 |
LILO of 132 kV Kathgodam-Rudrapur T/L at 132 kV S/s Dhaulakhera (Haldwani) (0.6 Ckm) | 25 |
LILO of 132 kV Khatima-Sitarganj T/L at 132/33 kV S/s Khatima-II ( 2 Ckm) | 25 |
400kV D/C (Twin Moose) Vishnugad- Pipalkoti HEP to Pipalkoti T/L. (1.6 Ckm) | 15 |
LILO of 220 kV Roorkee-Nara T/L at 220 kV S/s Manglore (2 Ckm). | 15 |
LILO of 220 kV Tanakpur-CB Ganj T/L at proposed 220 kV S/s Banbasa, Tanakpur (0.3 Ckm). | 02 |