Transmission Line

Details of Transmission Lines in Garhwal
Name of the Transmission Line Type of Line Line Length Line Length (Ckt Km) Conductor used Date of Commissioning
400 kV Rishikesh-Nehtaur (Rishikesh to LILO point at location no. 233) S/C 73.580 73.580 Twin Moose 5/1985 & 13/11/2006, 03.06.2017
400 kV Rishikesh-(Roorkee) Puhana S/C 48.650 48.650 Twin Moose 31-03-1984 & 07.01.2005,30-03-2009 
400 kV (Roorkee) Puhana-Muzaffarnagar Line S/C 65.55 65.550 Twin Moose 31.03.1984, 01.01.2005 & 29.03.2009
400 kV Srinagar-Srinagar PH (GVK) Line-I D/C 14.200 14.200 Twin Moose 25-07-2016
400 kV Srinagar-Srinagar PH (GVK) Line-II 14.200 14.200 Twin Moose 25-07-2016
400 kV Pipalkoti-Srinagar Line D/C 86.215 172.430 Quad Moose 01.04.2026
Sub Total 302.40 388.61    
Name of the Transmission Line Type of Line Line Length Line Length (Ckt Km) Conductor used Date of Commissioning
220 kV Chibro - Khodri - I st S/C 5.771 5.771 ACSR DEER 1974
220 kV Chibro - Khodri - II nd S/C 8.596 8.596 ACSR DEER 1976
220 kV Khodri - Jhajhra S/C 27.450 27.450 ACSR DEER 03/1976 & 30/01/2015
220 kV Jhajhra-Sherpur (PGCIL)  S/C 6.11 6.11 ACSR ZEBRA 01.02.2017
220 kV Jhajhra-Vyasi line  S/C 40.290 40.290 ACSR ZEBRA 13.04.2022
220 kV Sherpur (PGCIL) -Vyasi Line S/C 36.79 36.79 ACSR ZEBRA 04.05.2022
220 kV IIP- Rishikesh Line S/C 30.997 30.997 ACSR DEER 01.03.1976
220 kV IIP- Jhajhra Line S/C 26.024 26.024 ACSR DEER 01.03.1976
220 kV IIP- Rishikesh- Jhajhra Line (LILO) D/C 0.015 0.030 ACSR ZEBRA 04.08.2018
220 kV Line from interconnection point of M/s L&T HEP to Srinagar S/s (400 kV) Circuit-I D/C 75.040 75.040 ACSR ZEBRA 02.06.2020
220 kV Line from interconnection point of M/s L&T HEP to Srinagar S/s (400 kV) Circuit-II 75.040 75.040 ACSR ZEBRA 02.06.2020
220 kV Uttarkashi- Dharasu -1st S/C 25.002 25.002 ACSR ZEBRA 22-03-1986
220 kV Uttarkashi- Dharasu – 2nd S/C 24.700 24.70 ACSR ZEBRA 22-03-1986
220 kV Rishikesh- Dharasu - 1st S/C 79.960 79.960 ACSR ZEBRA 22-03-1986
220 kV Rishikesh- Dharasu – 2nd S/C 80.40 80.400 ACSR ZEBRA 23-04-2009
220 kV Chamba- Dharasu S/C 38.558 38.558 ACSR ZEBRA 31-03-1983
220 kV Chamba- Rishikesh S/C 40.500 40.500 ZEBRA 31-03-1983
220 kV Chamba - Ghansali S/C 35.785 35.785 ACSR ZEBRA 30-09-2009
220 kV Ghuttu – Ghansali ckt-1st S/C 19.50 19.50 ACSR ZEBRA 21-10-2011
220 kV Rishikesh - SIDCUL (Haridwar) S/C 25.095 25.095 ACSR ZEBRA 17-09-1979
19/06/2006 (Lilo at Sidcul)
220 kV Roorkee-Railway Traction Line S/C 4.800 4.800 ACSR Zebra 15-07-2005
220 kV Roorkee-Puhana Line S/C 8.900 8.900 ACSR Deer/Zebra 23-11-2010
220 kV Pirankaliyar -Puhana Line-1st S/C 19.47 19.47 ACSR Zebra 23-09-2018
220 kV Pirankaliyar -Puhana D/C line (ckt II&III) S/C 14.00 14.00 ACSR Zebra 19.09.2020
220 kV  Pirankaliyar-SIDCUL line S/C 18.96 18.96 ACSR Zebra 23-09-2018
LILO of 220 kV Khodri-Jhajra Underground line at 220 kV Substation Selaqui Dehradun. D/C 0.70 1.40 XLPE Cable (UG) 21.06.2026
Sub Total 768.45 769.17    
Name of the Transmission Line Type of Line Line Length Line Length (Ckt Km) Conductor used Date of Commissioning
132 kV Kulhal - Giribata (H.P.) S/C 1.680 1.680 ACSR PANTHER 01-03-1975
132 kV Majra - Bindal S/C 8.600 8.600 ACSR PANTHER 1966 & 08/03/1992
132 kV Majra - Jhajhra S/C 15.76 15.76 ACSR PANTHER 16/04/1976, 29/07/15
132 kV Jhajhra - Kulhal S/C 31.97 31.97 ACSR PANTHER 16/04/1976, 29/07/15
132 kV Majra - Kulhal S/C 42.35 42.35 ACSR PANTHER 16-04-1976
132 kV Dhakrani - Dhalipur S/C 5.60 5.60 ACSR PANTHER 1966
132 kV Dhalipur - Kulhal S/C 5.59 5.59 ACSR PANTHER 03/1975
132 kV Majra - Laltappar S/C 27.320 27.320 ACSR PANTHER 16.04.1976, 13.02.2015
132 kV Laltappar - Rishikesh S/C 16.050 16.050 ACSR PANTHER 16.04.1976, 13.02.2015
132 kV Purkul Gaon - Jhajhra S/C 21.315 21.315 ACSR PANTHER 1966 & 03/03/1984 & 24/02/2017
132 kV Jhajhra -Dhalipur S/C 26.474 26.474 ACSR PANTHER 1966 & 03/03/1984 & 24/02/2017
132 kV Khodri-Dhakrani S/C 8.884 8.884 ACSR PANTHER 01-04-1972
132 kV Purkul Gaon - Majra S/C 22.772 22.772 ACSR PANTHER 1966 & 27/03/1983
132 kV Rishikesh - Bindal S/C 44.600 44.600 ACSR PANTHER  31/03/1983 & 03/1992
132 kV Rishikesh- Srinagar (400kV S/s) S/C  66.66 66.66 ACSR PANTHER 30/06/1980 & LILO Portion 24/ 04/2016
132 kV Srinagar(400kV)-Srinagar(132kV) S/C  14.0 14.0 ACSR PANTHER 30/06/1980 & LILO Portion 24/04/2016
132 kV Srinagar- Simli D/C 32.23 64.45 ACSR PANTHER 26-04-2016
132 kV Srinagar-Satpuli Ckt-1st D/C 52.40 52.40 ACSR PANTHER 25-02-2013
132 kV Srinagar-Satpuli Ckt-2nd 52.40 52.40 ACSR PANTHER 28.09.2020
132 kV Satpuli - Kotdwar ckt-1st S/C 46.80 46.80 ACSR PANTHER 28-01-2010
132 kV Satpuli - Kotdwar ckt-2nd S/C 46.80 46.80 ACSR PANTHER 22.12.2019
132 kV Bhuptwala - Chilla - Rishikesh S/C 23.00 23.00 ACSR PANTHER 28-12-2003
132 kV Jawalapur - Roorkee S/C 26.570 26.570 ACSR PANTHER 07-12-1978
132 kV SIDCUL (Haridwar) - Roorkee S/C 26.612 26.612 ACSR PANTHER 22-07-2006
132 kV SIDCUL (Haridwar) -  Hero moto S/C 2.735 2.735 ACSR PANTHER 02-06-2011
132 kV Jawalapur - SIDCUL (Haridwar) Ckt -1st S/C 4.150 4.150 ACSR PANTHER 05-06-2007
132 kV Jawalapur - SIDCUL (Haridwar) Ckt -2nd S/C 4.138 4.138 ACSR PANTHER 09.02.2022
132 kV Jwalapur - Bhuptwala S/C 10.257 10.257 ACSR PANTHER 30-12-2003
132 kV Jwalapur - Chilla S/C 16.89 16.89 ACSR PANTHER 01-01-1979
132 kV Jwalapur - Rishikesh S/C 22.97 22.97 ACSR PANTHER 01-01-1979
132 kV Jwalapur - Railway  S/C 4.520 4.520 ACSR PANTHERT 07.03.2020
132 kV Padharth- Nazibabad - Kotdwar line  S/C 66.337 66.337 ACSR PANTHER 8/10/1980(C-N), 28.03.1995 (K-N) & LILO 16.08.2022
132 kV Chilla - Padhartha line S/C 23.141 23.141 ACSR PANTHER 8/10/1980(C-N), & LILO 16.08.2022
132 kV Roorkee-LSM Line S/C 7.631 7.631 ACSR Panther 03-12-2013
132 kV LSM-Bhagwanpur Line S/C 17.57 17.57 ACSR Panther  14-03-2013
132 kV Roorkee-Ultratech Line S/C 6.90 6.90 ACSR Panther  15.12.2015 & 08.01.2026
132 kV Ultratech-Chudiyala Line S/C 9.00 9.00 ACSR Panther 15.12.2015 & 08.01.2026
132 kV Pirankaliyar-Bhagwanpur Line S/C 10.200 10.200 ACSR Panther  19.04.2021
132 kV Pirankaliyar-Chudiyala Line S/C 16.10 16.10 ACSR Panther  19.04.2021
132 kV Roorkee-Laksar Line S/C 26.50 26.50 HTLS 26.11.2007
132 kV Laksar-RBNS S/C 4.48 4.48 ACSR Panthar 01-04-2008
132 kV Laksar-Manglore Line S/C 28.08 28.08 Wolf and Panther 31.07.2020
132 kV Roorkee - Manglore  S/C 11.500 11.500 HTLS 27-10-2006
132 kV Manglore ASAHI Glass-I (Air Liquid) S/C 6.413 6.413 ACSR panther 29-10-2006
132 kV Manglore ASAHI Glass-II (Air Liquid) S/C 6.413 6.413 ACSR panther 29-10-2006
132 kV Bindal-Purkul Line S/C 11.500 11.500 ACSR Panther (10 KM)  & XLPE Cable (UG)(1.75 KM)  02.07.2025
Sub Total 983.86 1016.08    
Details of Transmission Lines in Kumaon